14th April 2008
One Wilshire issues
We have quite a few servers down in Los Angeles, and we suspect it’s due to a UPS failure. There are many other companies that are on the same floor and all are down as well. More information to be posted shortly.
Update: The problem was very widespread both the primary and redundant feeds failed. So we are waiting on the staff at the datacenter and the electricians to let us know how it was possible. This issue was half the floor, not 1 little cage.. This was a severe issue.
More Info: Main breaker tripped where primary C and D feeds come in. C is primary feed and D is a redundant feed. This was 3 layers up the chain, so that’s why it was a massive failure. So when the breaker tripped, no generator could kick in when the breaker supplying the power tripped. That is the report for now, more to be posted.
Update: All servers have been up for a while now.
General announcements 3:19 AM GMT